← All Briefings

Government Property Risk of Loss Under FAR 52.245-1 and Contractor Insurance Decisions in 2026

A government contractor holding millions of dollars in government-furnished equipment faces an instinct that feels like prudence: insure it. The instinct is usually wrong, and occasionally expensive, because under the Federal Acquisition Regulation the default allocation of risk for government property runs the opposite direction from commercial intuition. On most federal contracts the Government, not the contractor, carries the risk of loss — and a contractor who insures that property anyway can convert a risk the government had assumed into a liability it now owns.

The default rule lives in FAR 45.104 and the risk-of-loss provisions of clause 52.245-1. On cost-reimbursement, time-and-material, and labor-hour contracts, and on fixed-price contracts awarded on the basis of certified cost or pricing data, the contractor generally is not held liable for loss of government property. The Government effectively self-insures that property. The policy logic is straightforward: on these contract types the Government is already bearing the contractor's reasonable costs, so charging the contractor for lost property — and paying it to insure against that loss — would simply move money in a circle. The clause therefore relieves the contractor of liability unless the contract says otherwise.

The relief is not unconditional, and the exceptions are where contractors have to pay attention. Paragraph (h) of 52.245-1 makes the contractor liable when any one of three things is true: the loss is covered by insurance or the contractor is otherwise reimbursed, to the extent of that coverage; the loss results from willful misconduct or lack of good faith on the part of the contractor's managerial personnel — its directors, officers, and senior managers; or the contracting officer has revoked the Government's assumption of risk in writing after finding the contractor's property management practices inadequate, and the contractor failed to correct them. A separate variant, Alternate I, flips the default entirely and makes the contractor responsible for loss from the moment the property is delivered.

The first exception is the one that turns the insurance instinct into a trap. Because the contractor becomes liable to the extent the loss is covered by insurance, carrying property coverage on government-furnished property can create liability that would not otherwise exist — the policy proceeds become the measure of the contractor's exposure. FAR 31.205-19 then governs whether the premium for that coverage is even an allowable cost on a government contract, and coverage bought against a risk the Government had already assumed is difficult to justify as a necessary cost of performance. A contractor can end up paying an unallowable premium to manufacture a liability it did not have. Deliberate is the operative posture; reflexive is the one that costs money.

That does not mean government-furnished property is never a contractor's concern. The relief in FAR 45.104 does not extend to every arrangement. Fixed-price contracts not awarded on certified cost or pricing data — including many commercial-item acquisitions — can place the risk on the contractor, and a prime that furnishes government property to a subcontractor is not relieved of its own responsibilities under the clause. The exposure is also real whenever the contracting officer has revoked the assumption of risk, which is not an abstract possibility: it is the direct consequence of a property management system the Government has found noncompliant. In each of those situations, coverage — and its cost treatment — is a legitimate and necessary question rather than a reflex.

Read correctly, the clause points to the real control, and it is not an insurance policy. It is the contractor's property management system. A system that meets the contract's requirements keeps the Government's assumption of risk intact and keeps the contractor inside the relief the regulation grants. A system the property administrator finds inadequate is the trigger that can revoke that assumption and shift the loss onto the contractor's books. The discipline that protects the balance sheet is accountability for the property itself — the records, the physical controls, the reporting — not a premium paid to stand behind the Government's own assumption of risk.

This is precisely the analysis our 4-Step Strategic Process runs for a government contractor. Strategic Discovery inventories the government property on every contract and identifies the contract type and clause governing each. Risk Assessment determines where the Government has assumed the risk, where the contractor genuinely bears it, and where a weak property system has put the assumption in jeopardy. Solution Design places coverage only where the contract actually leaves the exposure with the contractor, and confirms the cost treatment under FAR 31.205-19. Ongoing Optimization keeps the property management system and the insurance decision aligned as the contract mix changes.

The contractor who insures government property by habit is answering a question the contract may have already answered in its favor. The disciplined answer is to read the clause and the contract type together, to let the property management system carry the weight it was designed to carry, and to spend premium dollars only where the risk of loss genuinely rests with the contractor. On a federal contract, the most expensive coverage is often the coverage that was never needed.

Sources: Acquisition.gov — FAR 52.245-1, Government Property; Acquisition.gov — FAR 45.104, Responsibility and Liability for Government Property; Acquisition.gov — FAR 31.205-19, Insurance and Indemnification; Federal Register — FAR Government Property Final Rule (risk-of-loss framework); Acquisition.gov — FAR Subpart 28.3, Insurance; FAC-C Professional Study Guide — Government Property Administration and Liability (FAR Part 45)

— Ryan Mefford, President & Risk Advisor